ONE DAY TO VISIT MABUCHI WORKS
Saigon, at 8:00 am, November 22 this year.
We climbed into the car and departed at 8:00 am at Le Gia Phuc company. They both include two designers, 2 market managers (volume managers), and a non-genuine maketer. See you at the Mabuchi site in 2 hours, but first you have to buy two cups of coffee for him to wake up at the beginning of the alley and start counting.
They both arrive close to 10 o’clock. The first impression upon arriving at Mabuchi construction site in Amata, Dong Nai, is “sky, it’s sunny”. After a handshake to shake hands with construction site team and bosses also arrived. Everyone wears protective gear and goes to the construction site to get some sunlight to increase the dark pigmentation.
The bosses look at every detail and compare the drawings and reality. “Oh dear! The warehouse is tidy up, kids, ”the deputy boss told the engineers. “Oh! Why are you setting the ground high ?! I have to subtract that my side still has to spread stone and concrete to nearly 3 feet. ” The deputy director continued as the team switched to ground elevation testing. “I advise you to dig the foundation hole first and then fill the high ground for ironing, otherwise it will take a lot of ironing”, the technical designer instructed the construction engineers. Everyone goes around the project 20,356m2 everywhere, the weather is nice and sunny.
It must be said that the construction workers comply with the safety regulations! everyone must wear protective gear and safety corridors are arranged brightly to attract workers’ attention. Pictures and names of the driver’s workers are on the side of the vehicle door…
Post a Comment
You must be logged in to post a comment.