WATER-RESISTANT AND THERMAL FOR ROOF AT THE FACTORY
The working environment is hot, the ceilings are patchy and water leaks after the rain, reducing the use value of the newly invested building, the risk of damage to equipment, rising maintenance costs, accidental concrete falls. bare. All because of
CONSTRUCTION INFORMATION MODEL – BIM
CONSTRUCTION INFORMATION MODEL - BIM A new, innovative approach to design building, construction and management The BIM is, in essence, the intersection of two important ideas 1) Keeping critical design information digital makes it easy to update and share and
FINISHING PROCEDURE
After the construction is completed for the factory to be put into use, the following procedures are required: No. Content Duration 1 Checking of connection (traffic, water supply, wastewater,
CONSTRUCTION PERMIT APPLICATION PROCEDURE
Construction permit is a legal document issued by a functional agency before starting the work. Below are the conditions and procedures for applying for a construction permit. No. Content Duration (days) 1 Approved detailed planning 1/500 45 2 Verification of environmental impact assessment reports 45 3 Fire protection appraisal 30 4 Basic design appraisal